Professional Experience

An outdoor track with orange lanes in front of a modern stadium building with glass windows and brick walls. The stadium has tiered seating and a glass control tower.

Streamlining Pre-Construction Workflows

  • Role: Estimator at Dant Clayton Corporation.

  • Focus: Implementing new workflows to reduce turnaround time for bids.

  • Highlights: Calculating labor hours accurately based on trade-specific productivity rates, and leading cross-functional meetings to align stakeholders.


Modern multi-story building with red fire escape staircase and green plants on interior balconies

BIM Coordination & Clash Resolution

  • Role: Graduate Teaching Assistant at Wayne State University.

  • Focus: Identifying and organizing design clashes in BIM models using the clash detective function and data mining techniques.

  • Highlights: Co-authored publication, "Streamlining BIM Coordination and Clash Resolution through Risk and Relevance Analysis" from the Journal of Construction Engineering and Management.

Construction site with a three-story building framework made of concrete, construction workers in safety vests and hard hats, and a tall orange crane on the left, under a blue sky.

Structural Design & Retrofitting

  • Role: Structural Design Engineer at R&M International Pvt. Ltd., India.

  • Focus: Retrofitting and rehabilitations of columns, beams, and slabs for residential and industrial buildings, as well as commercial buildings and bridges.

  • Highlights: Conducting structural analysis to assess load capacities, optimizing material usage to reduce project costs, and mentoring junior engineers.